Project

General

Profile

Actions

QA #2874

closed

QA #1843: [STAG] New Cancellation - QA Test cases

QA #1844: ADMIN

QA #1846: Hotel Plan Master

QA #2240: [Cancellation tab] Hotel, List, Summary, New/Modify/Add/Delete btn, Confirm popup

[Cancellation - New/Add/Modify] Only 73 characters displayed in Cancellation Policy list after saving a title longer than 100 characters

Added by Holden Dang 2 months ago. Updated 2 months ago.

Status:
확인(Confirmed)
Priority:
보통(Normal)
Assignee:
Start date:
01/09/2026
Due date:
01/09/2026
% Done:

100%

Estimated time:
1.00 h
Build env.:
Dev

Description

Pre-condition:
- Navigate to the Cancellation tab

Steps:
1. Search for a hotel
2. Click New/Add/Modify button
3. Select any Room/Rate Type
4. Enter a Title longer than 100 characters
5. Enter other required fields
6. Click Save

Actual result: Only display 73 characters in Cancellation Policy list
Expected result: Title is limited to 100 characters with “...” if over 100 characters


Files

picture080-1.png (135 KB) picture080-1.png Actual result Holden Dang, 01/09/2026 01:53 AM
picture738-2.png (130 KB) picture738-2.png New/Add/Modify Holden Dang, 01/09/2026 07:51 AM
Actions #1

Updated by Joseph Vo 2 months ago

  • Assignee changed from Joseph Vo to Daniel Do
Actions #2

Updated by Daniel Do 2 months ago

  • Status changed from 신규(New) to 진행(Doing)
Actions #3

Updated by Daniel Do 2 months ago

  • Due date set to 01/09/2026
  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Daniel Do to Holden Dang
  • Start date set to 01/09/2026
  • % Done changed from 0 to 100
  • Estimated time set to 1.00 h
Actions #4

Updated by Holden Dang 2 months ago

  • Status changed from QA test to 완료실패(Failed)
  • Assignee changed from Holden Dang to Daniel Do

After the fix, the Application Period and start/end dates displays 2 rows
Expect now: Display the longest possible title and ensure that the title, Application Period and start/end dates are all displayed on a single line. (References can be up to 90 characters long)

Actions #5

Updated by Daniel Do 2 months ago

  • Status changed from 완료실패(Failed) to QA test
  • Assignee changed from Daniel Do to Holden Dang
Actions #6

Updated by Holden Dang 2 months ago

Tested Dev env => Passed

Actions #7

Updated by ziniy Kang 2 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
  • Build env. set to Dev
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)