Project

General

Profile

Actions

QA #2787

closed

QA #1843: [STAG] New Cancellation - QA Test cases

QA #1844: ADMIN

QA #1846: Hotel Plan Master

QA #2240: [Cancellation tab] Hotel, List, Summary, New/Modify/Add/Delete btn, Confirm popup

[Cancellation - New] Display an incorrect error message when the default period and the selected option period are identical

Added by Holden Dang 3 months ago. Updated about 2 months ago.

Status:
확인(Confirmed)
Priority:
보통(Normal)
Assignee:
Start date:
12/26/2025
Due date:
01/07/2026
% Done:

100%

Estimated time:
0.20 h
Build env.:
Dev

Description

Precondition:
- Admin is logged in
- Hotel and Rate Type data exist in the system
- Navigate to the Cancellation tab

Steps:
1. Search for a hotel
2. Click New button
3. Select Room/Rate type
4. Select Used radio button
5. Enter Default: 25-08-01~25-08-31
6. Enter all required fields
7. Enter Option 1: 25-08-01~25-07-15
8. Enter all required fields
9. Click +
10. Enter Option 2: 25-07-16~25-08-31
11. Enter all required fields
12. Click Save

Actual result: Alert "The option date range is invalid. Please check again."
Expected result: Alert "Default and option periods exactly match, registration not possible."


Files

picture892-1.png (118 KB) picture892-1.png Steps to reproduce Holden Dang, 12/25/2025 06:36 AM
picture892-2.png (118 KB) picture892-2.png Show Alert message Holden Dang, 12/25/2025 06:36 AM
picture710-1.png (118 KB) picture710-1.png Actual result Holden Dang, 01/13/2026 06:35 AM
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)