Project

General

Profile

Actions

QA #2713

closed

QA #1843: [STAG] New Cancellation - QA Test cases

QA #1844: ADMIN

QA #1846: Hotel Plan Master

QA #2240: [Cancellation tab] Hotel, List, Summary, New/Modify/Add/Delete btn, Confirm popup

[Cancellation - Modify] No confirmation message is displayed when editing any fields

Added by Holden Dang 3 months ago. Updated about 2 months ago.

Status:
확인(Confirmed)
Priority:
높음(High)
Assignee:
Start date:
01/06/2026
Due date:
01/06/2026
% Done:

100%

Estimated time:
1.00 h
Build env.:
Dev

Description

Pre-condition:
- Admin is logged in
- Hotel and Rate Type data exist in the system
- Cancellation policy created successfully
- Navigate to the Cancellation tab
Steps:
1. Search for a hotel
2. Click Modify
3. Edit any field
4. Click Save
Actual result: The confirmation message 'This will replace the existing policy. Change?' is not shown
Expected result: Show Alert popup:
- Description: This will replace the existing policy. Change?
- Buttons: Yes and No

If click Yes button, show message "Your save is complete" and checkboxes for Room/Plan type and display plan have been selected
If click No button, selection cancelled and existing state maintained


Files

Ohmy Admin - Google Chrome 2025-12-19 13-49-12.mp4 (14.8 MB) Ohmy Admin - Google Chrome 2025-12-19 13-49-12.mp4 Holden Dang, 12/19/2025 06:49 AM
picture555-1.png (84.3 KB) picture555-1.png Holden Dang, 12/19/2025 07:22 AM
picture034-1.png (118 KB) picture034-1.png Actual result Holden Dang, 01/08/2026 03:07 AM
picture034-2.png (65.6 KB) picture034-2.png Delete popup Holden Dang, 01/08/2026 03:07 AM
picture549-1.png (114 KB) picture549-1.png Expected result Holden Dang, 01/12/2026 03:27 AM
Actions #1

Updated by Holden Dang 3 months ago

Expected result: Alert

This will replace the existing registered cancellation policy.​

Would you like to change the cancellation policy for this Rate plan??

Yes and No

Actions #2

Updated by Joseph Vo 3 months ago

  • Assignee changed from Joseph Vo to Dan Hoang
Actions #3

Updated by Dan Hoang 2 months ago

  • Assignee changed from Dan Hoang to Tan Jang
Actions #4

Updated by Tan Jang 2 months ago

  • Due date set to 01/06/2026
  • Status changed from 신규(New) to 완료(Done)
  • Start date set to 01/06/2026
  • % Done changed from 0 to 100
  • Estimated time set to 1.00 h
Actions #5

Updated by Tan Jang 2 months ago

  • Status changed from 완료(Done) to QA test
  • Assignee changed from Tan Jang to Holden Dang
  • Build env. set to Dev
Actions #6

Updated by Holden Dang 2 months ago

Failed. Please fix it again. Thank you for your help.
- Expected:
+ Show Alert instead of Confirmation
+ Please delete ?* as there are 2 *?
+ There's a rather large space in the middle of the description. Please refer to Delete popup

Actions #7

Updated by Tan Jang about 2 months ago

  • Status changed from 완료실패(Failed) to QA test
  • Assignee changed from Tan Jang to Holden Dang
Actions #8

Updated by Holden Dang about 2 months ago

Tested Dev env => Passed

Actions #9

Updated by Holden Dang about 2 months ago

  • Status changed from QA test to 완료(Done)
  • Assignee changed from Holden Dang to Tan Jang
Actions #10

Updated by ziniy Kang about 2 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)