closed

[FE] Update the design and text of pop-up

Added by ziniy Kang 8 months ago. Updated 7 months ago.

Status:
완료성공(Resolve)
Priority:
높음(High)
Assignee:
Target version:
Start date:
07/23/2025
Due date:
07/24/2025
% Done:

100%

Estimated time:
Part:
FE
Build env.:
Prod

Description

The pop-up design and the developed screen do not match.
Correct the pop-ups in the same way as the design, and correct errors in text line.
팝업 디자인과 개발된 화면이 일치하지 않는다.
해당 팝업들을 디자인과 동일하게 수정하고, 텍스트 줄바꿈 오류 등을 수정한다.

https://www.figma.com/design/Dmp2GGEF8t2O6lCKp4iIaO/-928-Update-the-design-and-text-of-pop-up-%ED%8C%9D%EC%97%85-%EB%94%94%EC%9E%90%EC%9D%B8-%EB%B0%8F-%ED%85%8D%EC%8A%A4%ED%8A%B8-%EC%88%98%EC%A0%95?node-id=1-158&t=Kc1BAjNjM2TbhAIg-1

Link design: https://www.figma.com/design/Mmhz2a9WksJSZMjr13cqRj/Hana-card-travel-bucket?node-id=40000427-4674&t=hyzcKLLAAYSY4Ahl-0


Files

stgtest_01.png (52.3 KB) stgtest_01.png Lexi Kim, 07/24/2025 09:08 AM
stgtest_02.png (73.4 KB) stgtest_02.png Lexi Kim, 07/24/2025 09:08 AM
image.png (53.1 KB) image.png Lexi Kim, 07/25/2025 04:00 AM

Related issues

Related to Hana card travel bucket - 개선(improvement) #928: [Plan] Update the design and text of pop-up 팝업 디자인 및 텍스트 수정완료성공(Resolve)Lexi Kim07/22/202507/23/2025

Actions
Actions #1

Updated by ziniy Kang 8 months ago

  • Related to 개선(improvement) #928: [Plan] Update the design and text of pop-up 팝업 디자인 및 텍스트 수정 added
Actions #2

Updated by Lexi Kim 8 months ago

  • Description updated (diff)
Actions #3

Updated by Lexi Kim 8 months ago

  • Subject changed from Update the design and text of pop-up to [FE] Update the design and text of pop-up
  • Assignee changed from ziniy Kang to Joseph Vo
  • Part set to FE
Actions #4

Updated by ziniy Kang 8 months ago

  • Priority changed from 보통(Normal) to 높음(High)
Actions #5

Updated by Joseph Vo 8 months ago

  • Assignee changed from Joseph Vo to harry harry
Actions #6

Updated by Joseph Vo 8 months ago

  • Assignee changed from harry harry to John Lee
Actions #7

Updated by ziniy Kang 8 months ago

  • Description updated (diff)
Actions #8

Updated by John Lee 8 months ago

  • Due date set to 07/24/2025
  • Status changed from 신규(New) to 피드백(Feedback)
  • Assignee changed from John Lee to ziniy Kang
  • Start date set to 07/23/2025
  • % Done changed from 0 to 100
  • Build env. set to Staging

hi c ziniy Kang, This task is deployed on staging. Please help me to check. Thank you!

Actions #9

Updated by Lexi Kim 8 months ago

The 2 pop-ups below have not been modified yet, please refer to the attached file.

Actions #10

Updated by ziniy Kang 8 months ago

  • Assignee changed from ziniy Kang to John Lee
Actions #11

Updated by John Lee 8 months ago

  • Assignee changed from John Lee to Lexi Kim

hi c Lexi Kim, This issue is deployed on staging again. Please help me to check. Thank you!

Actions #12

Updated by Lexi Kim 8 months ago

25 July STG test done.
I retested the two screens, and they were all reflected.

The two pop-ups below cannot be tested in STG, so they should be tested in PROD.

Actions #13

Updated by Lexi Kim 8 months ago

  • Status changed from 피드백(Feedback) to 진행(Doing)
  • Assignee changed from Lexi Kim to John Lee
Actions #14

Updated by John Lee 7 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
  • Assignee changed from John Lee to Lexi Kim
  • Build env. changed from Staging to Prod

hi Lexi Kim, This task is deployed on prod. Please help me to check. Thank you!

Actions #15

Updated by Lexi Kim 7 months ago

  • Assignee changed from Lexi Kim to Kelly Nguyen
Actions #16

Updated by Kelly Nguyen 7 months ago

  • Assignee changed from Kelly Nguyen to John Lee

Pop up liên quan đến BK fail do pending sẽ check sau khi có trường hợp pending. Còn lại các pop up khác theo như trên plan oke rồi nha

Actions #17

Updated by John Lee 7 months ago

  • Assignee changed from John Lee to Kelly Nguyen

Thanks c Kelly Nguyen, vậy em tạm closed task này nhé. Khi nào chị check xong popup pending nếu bị failed thì reopen task này nhé.

Actions #18

Updated by ziniy Kang 7 months ago

  • Status changed from 피드백(Feedback) to 완료성공(Resolve)
  • Assignee changed from Kelly Nguyen to John Lee
Actions #19

Updated by ziniy Kang 7 months ago

Nếu sau này xảy ra popup pending issue, check sau.
Đóng task.

Actions