Project

General

Profile

Actions

기능(Feature) #50

open

[OMT/PC] 1.2. 마이페이지 > 포인트 관리 My page > Quản lý point

Added by Lexi Kim 11 months ago. Updated 10 months ago.

Status:
피드백(Feedback)
Priority:
보통(Normal)
Assignee:
Start date:
05/05/2025
Due date:
% Done:

40%

Estimated time:
32.00 h
Part:
Build env.:

Description

[1.2. 마이페이지 > 포인트 관리 My page > Quản lý point] screen is under development.
Please check section 1.2. in the Notion link and the Figma link.

Point System Policy
https://www.notion.so/B2C-Point-System-1bc0df1854a1804aa623d331197a0c2d?pvs=4#1ce0df1854a180cdb3cdee4b744dc7ab

Design
https://www.figma.com/design/m9py67IsdisDZfkrvJZ0TQ/OMT-Point-System?node-id=0-1&t=6texRWcsJ1qckNDi-1

The image of the screen to be developed is as below.



Files

image.png (606 KB) image.png Lexi Kim, 04/25/2025 05:36 AM
image.png (152 KB) image.png Lexi Kim, 04/25/2025 05:36 AM
image.png (587 KB) image.png Lexi Kim, 04/25/2025 05:36 AM

Related issues

Copied to OMT KR - 기능(Feature) #51: [OMT/Mob] 1.2. 마이페이지 > 포인트 관리 My page > Quản lý point피드백(Feedback)ziniy Kang05/09/2025

Actions
Copied to OMT KR - 기능(Feature) #173: [OMT/PC - BE] 1.2. 마이페이지 > 포인트 관리 My page > Quản lý point완료(Done)ziniy Kang05/16/2025

Actions
Actions #1

Updated by Lexi Kim 11 months ago

  • Copied to 기능(Feature) #51: [OMT/Mob] 1.2. 마이페이지 > 포인트 관리 My page > Quản lý point added
Actions #2

Updated by Lexi Kim 11 months ago

  • Description updated (diff)
Actions #3

Updated by ziniy Kang 11 months ago

  • Assignee set to Joseph Vo
Actions #4

Updated by ziniy Kang 11 months ago

  • Due date set to 06/30/2025
Actions #5

Updated by Joseph Vo 11 months ago

  • Assignee changed from Joseph Vo to Joo dev
Actions #6

Updated by ziniy Kang 11 months ago

  • Due date changed from 06/30/2025 to 05/16/2025
Actions #7

Updated by Joo dev 10 months ago

  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 05/05/2025
Actions #8

Updated by ziniy Kang 10 months ago

  • Priority changed from 보통(Normal) to 높음(High)
Actions #9

Updated by Joseph Vo 10 months ago

  • Copied to 기능(Feature) #173: [OMT/PC - BE] 1.2. 마이페이지 > 포인트 관리 My page > Quản lý point added
Actions #10

Updated by Joo dev 10 months ago

  • % Done changed from 0 to 50
  • Estimated time set to 32.00 h
Actions #11

Updated by Joo dev 10 months ago

  • % Done changed from 50 to 40
Actions #12

Updated by Joo dev 10 months ago

dev note: done UI, wating api

Actions #13

Updated by ziniy Kang 10 months ago

  • Priority changed from 높음(High) to 보통(Normal)
Actions #14

Updated by ziniy Kang 10 months ago

BE done rồi nhé anh.

Actions #15

Updated by ziniy Kang 10 months ago

  • Due date deleted (05/16/2025)
Actions #16

Updated by ziniy Kang 10 months ago

  • Assignee changed from Joo dev to ziniy Kang
Actions #17

Updated by ziniy Kang 10 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)