Project

General

Profile

Actions

기능(Feature) #49

open

[OMT/Mob] 1.1 GNB Top

Added by Lexi Kim 11 months ago. Updated 10 months ago.

Status:
피드백(Feedback)
Priority:
보통(Normal)
Assignee:
Start date:
05/19/2025
Due date:
% Done:

50%

Estimated time:
4.00 h
Part:
Build env.:

Description

[1.1. GNB TOP] screen is under development.
Please check section 1.1. in the Notion link and the Figma link.

Point System Policy
https://www.notion.so/B2C-Point-System-1bc0df1854a1804aa623d331197a0c2d?pvs=4#1ce0df1854a180dea703eae2c6d31b79

Design
https://www.figma.com/design/m9py67IsdisDZfkrvJZ0TQ/OMT-Point-System?node-id=0-1&t=6texRWcsJ1qckNDi-1

The image of the screen to be developed is as below.


Files

image.png (75.1 KB) image.png Lexi Kim, 04/25/2025 05:27 AM
Actions #1

Updated by ziniy Kang 11 months ago

  • Assignee set to Joseph Vo
Actions #2

Updated by ziniy Kang 11 months ago

  • Due date set to 06/30/2025
Actions #3

Updated by Joseph Vo 11 months ago

  • Assignee changed from Joseph Vo to Joo dev
Actions #4

Updated by ziniy Kang 11 months ago

  • Due date changed from 06/30/2025 to 05/16/2025
Actions #5

Updated by Joo dev 10 months ago

  • Estimated time set to 4.00 h
Actions #6

Updated by Joo dev 10 months ago

  • Due date changed from 05/16/2025 to 05/24/2025
  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 05/19/2025
  • % Done changed from 0 to 50
Actions #7

Updated by ziniy Kang 10 months ago

  • Due date deleted (05/24/2025)
Actions #8

Updated by ziniy Kang 10 months ago

  • Assignee changed from Joo dev to ziniy Kang
Actions #9

Updated by ziniy Kang 10 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)