Project

General

Profile

Actions

QA #3085

closed

QA #3084: [DEV] Promotion_QA test cases

[DEV] Wrong LNB

Added by Tracy Truong 29 days ago. Updated 14 days ago.

Status:
완료(Done)
Priority:
보통(Normal)
Assignee:
Target version:
-
Start date:
02/10/2026
Due date:
02/10/2026
% Done:

100%

Estimated time:
4.00 h
Build env.:
Dev

Description

Currently, LNB on Extranet not change to 3 depth as requirement
AND
On extranet we have ROOM TYPE & RATE PLAN, but on requirement has ROOM PLAN only. Please reconfirm


Files

picture605-1.png (37.6 KB) picture605-1.png Current extranet Tracy Truong, 02/09/2026 07:21 AM
picture605-2.png (36.9 KB) picture605-2.png Requirement Tracy Truong, 02/09/2026 07:21 AM
picture928-1.png (31.4 KB) picture928-1.png current Tracy Truong, 02/12/2026 08:18 AM
picture928-2.png (24.9 KB) picture928-2.png design Tracy Truong, 02/12/2026 08:18 AM
image.png (16.7 KB) image.png Tan Jang, 02/12/2026 08:28 AM
picture027-1.png (10.1 KB) picture027-1.png Tracy Truong, 02/12/2026 09:43 AM
picture027-2.png (29.9 KB) picture027-2.png Tracy Truong, 02/12/2026 09:43 AM
picture938-1.png (40.1 KB) picture938-1.png Tracy Truong, 02/24/2026 03:57 AM
picture938-2.png (21.1 KB) picture938-2.png Tracy Truong, 02/24/2026 03:57 AM
Actions #1

Updated by Joseph Vo 29 days ago

  • Subject changed from Wrong LNB to [DEV] Wrong LNB
Actions #2

Updated by Joseph Vo 29 days ago

  • Assignee changed from Joseph Vo to Dan Hoang
Actions #3

Updated by Tan Jang 28 days ago

  • Due date set to 02/10/2026
  • Status changed from 신규(New) to 진행(Doing)
  • Assignee changed from Dan Hoang to Tan Jang
  • Start date set to 02/10/2026
Actions #4

Updated by Tan Jang 26 days ago

  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Tan Jang to Tracy Truong
  • % Done changed from 0 to 100
  • Estimated time set to 4.00 h
  • Build env. set to Dev
Actions #5

Updated by Tracy Truong 26 days ago

LNB is changed to 3 depth => ok
BUT as design, only selected main tab is black, unselected main tab is gray

Actions #6

Updated by Tan Jang 26 days ago

  • File image.png image.png added
  • Status changed from 완료실패(Failed) to 피드백(Feedback)
  • Assignee changed from Tan Jang to Tracy Truong


này mở ra nó đậm, đóng lại nó xám. cái này có sẵn của theme rồi, không cần fix đâu.

Actions #7

Updated by Tracy Truong 26 days ago

1. Colapse arrow wrong color (currently, it's white, expected is gray)
2. Rate & Available tab, when expand, can not colapse
3. này mở ra nó đậm, đóng lại nó xám. cái này có sẵn của theme rồi, không cần fix đâu. => Please discuss with design Eric Quach

Actions #8

Updated by Tracy Truong 26 days ago

  • Assignee changed from Tracy Truong to Tan Jang
Actions #9

Updated by Tan Jang 15 days ago

  • Status changed from 완료실패(Failed) to 진행(Doing)
Actions #10

Updated by Tan Jang 14 days ago

  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Tan Jang to Tracy Truong
Actions #11

Updated by Tracy Truong 14 days ago

Tracy Truong wrote in #note-7:

1. Colapse arrow wrong color (currently, it's white, expected is gray)
2. Rate & Available tab, when expand, can not colapse
3. này mở ra nó đậm, đóng lại nó xám. cái này có sẵn của theme rồi, không cần fix đâu. => Please discuss with design Eric Quach

retested, ok

Actions #12

Updated by Eric Quach 14 days ago

3. này mở ra nó đậm, đóng lại nó xám. cái này có sẵn của theme rồi, không cần fix đâu. => Please discuss with design Eric Quach => Eric Quach cái này theo theme sẵn hệ thống, hông cần fix đâu em

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)