Project

General

Profile

Actions

개선(improvement) #206

closed

[WEB+MOBILE] _ Build Design System (Ohmyhotel) based on Traport design

Added by Eric Quach 10 months ago. Updated 5 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
05/09/2025
Due date:
05/16/2025
% Done:

100%

Estimated time:
16.00 h
Part:
DESIGN
Build env.:

Description

Build Design System (Ohmyhotel) based on Traport design:
5. Components: label, tag and the rest
Link: https://www.figma.com/design/5DnmjFtdawBQau0RdtBGjj/B2C---Ohmyhotel?node-id=7759-1771


Related issues

Related to Ellis improvement - 개선(improvement) #703: # OMH Main Page완료성공(Resolve)ziniy Kang06/27/202508/15/2025

Actions
Actions #1

Updated by Eric Quach 10 months ago

  • Due date changed from 05/13/2025 to 05/16/2025
  • % Done changed from 0 to 40
Actions #2

Updated by Eric Quach 10 months ago

  • Start date set to 05/09/2025
Actions #4

Updated by Eric Quach 10 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
  • Assignee changed from Eric Quach to Lexi Kim

Lexi Kim
Please review and let me know if you have any idea. We wil discuss about it. Thank you!

Actions #5

Updated by Lexi Kim 8 months ago

  • Status changed from 피드백(Feedback) to 완료(Done)
  • Assignee changed from Lexi Kim to Eric Quach

Building Design System (Ohmyhotel) based on Traport design is done.
If new design system work is required due to the OMH main screen renewal, a new task should be created. #703

Actions #6

Updated by ziniy Kang 8 months ago

Actions #7

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)