Project

General

Profile

Actions

결함(Bug) #1936

closed

결함(Bug) #1329: Login issue

[MO] Verification code error message is not exposed.

Added by Lexi Kim 5 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
10/15/2025
Due date:
10/15/2025
% Done:

100%

Estimated time:
Part:
MO
Build env.:
Prod

Description

If the verification code is entered incorrectly on the mobile, the notification message is not exposed.

StoryBoard page 7-2
https://www.figma.com/design/vOGs1fRewULwCFidZcWR69/Login---Sign-up-process?node-id=124-9125&t=K0VH7Us07bPfGctK-1

Issue
Please check the video.


Files

화면 녹화 중 2025-10-15 103721.mp4 (1.56 MB) 화면 녹화 중 2025-10-15 103721.mp4 Lexi Kim, 10/15/2025 01:42 AM
picture377-1.png (53.6 KB) picture377-1.png Tracy Truong, 10/15/2025 07:57 AM
picture377-2.png (54.1 KB) picture377-2.png Tracy Truong, 10/15/2025 07:57 AM
picture829-1.png (245 KB) picture829-1.png Tracy Truong, 11/03/2025 02:54 AM
picture829-2.png (273 KB) picture829-2.png Tracy Truong, 11/03/2025 02:54 AM
picture829-3.png (265 KB) picture829-3.png Tracy Truong, 11/03/2025 02:54 AM
picture829-4.png (273 KB) picture829-4.png Tracy Truong, 11/03/2025 02:54 AM
picture829-5.png (284 KB) picture829-5.png Tracy Truong, 11/03/2025 02:54 AM
Actions #1

Updated by harry harry 5 months ago

  • Assignee changed from harry harry to John Lee
Actions #2

Updated by John Lee 5 months ago

  • Status changed from 신규(New) to 진행(Doing)
Actions #3

Updated by John Lee 5 months ago

  • % Done changed from 0 to 100
Actions #4

Updated by ziniy Kang 5 months ago

  • Due date set to 10/15/2025
  • Start date set to 10/15/2025
Actions #5

Updated by John Lee 5 months ago

  • Status changed from 진행(Doing) to QA test
  • Assignee changed from John Lee to Tracy Truong
  • Build env. set to Staging
Actions #6

Updated by Tracy Truong 5 months ago

Message already added.
About the message content,
ziniy Kang Kang please share with me information to test. In requirement only have KR & VI ver

Actions #7

Updated by ziniy Kang 5 months ago

  • Assignee changed from ziniy Kang to Lexi Kim
Actions #8

Updated by Lexi Kim 5 months ago

  • Status changed from 피드백(Feedback) to 확인(Confirmed)
  • Assignee changed from Lexi Kim to John Lee

stg test done. thank you.

Actions #9

Updated by John Lee 4 months ago

  • Build env. changed from Staging to Prod
Actions #10

Updated by John Lee 4 months ago

  • Status changed from 확인(Confirmed) to QA test
Actions #11

Updated by John Lee 4 months ago

  • Assignee changed from John Lee to Tracy Truong
Actions #12

Updated by Tracy Truong 4 months ago

Checked on Prod, ok

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)