Project

General

Profile

Actions

결함(Bug) #1919

closed

결함(Bug) #1329: Login issue

Reservation Screen – Design Consistency Check with Travel Agency Layout

Added by ziniy Kang 5 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
10/14/2025
Due date:
10/14/2025
% Done:

100%

Estimated time:
Part:
Build env.:
Prod

Description

Reservation screen (staging): Fix lại khoảng cách box trên box dưới cho đồng nhất


Files

picture162-1.png (299 KB) picture162-1.png ziniy Kang, 10/14/2025 01:45 AM
picture162-2.png (144 KB) picture162-2.png ziniy Kang, 10/14/2025 01:45 AM
image.png (108 KB) image.png Eric Quach, 10/14/2025 09:48 AM
Actions #1

Updated by Joseph Vo 5 months ago

  • Assignee changed from Joseph Vo to harry harry
Actions #2

Updated by harry harry 5 months ago

  • Assignee changed from harry harry to Dante Le
Actions #3

Updated by Dante Le 5 months ago

  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 10/14/2025
  • Build env. set to Dev
Actions #4

Updated by Dante Le 5 months ago

  • Due date set to 10/14/2025
  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Dante Le to Tracy Truong
  • % Done changed from 0 to 100
  • Build env. changed from Dev to Staging
Actions #5

Updated by Tracy Truong 5 months ago

  • Assignee changed from Tracy Truong to Eric Quach

Please support to check this task. Thank you

Actions #6

Updated by Eric Quach 5 months ago

Check and fix again

Actions #7

Updated by Lexi Kim 5 months ago

  • Status changed from 피드백(Feedback) to 완료실패(Failed)
  • Assignee changed from Eric Quach to Dante Le
Actions #8

Updated by Dante Le 5 months ago

  • Status changed from 완료실패(Failed) to QA test
  • Assignee changed from Dante Le to Eric Quach
Actions #9

Updated by Eric Quach 5 months ago

  • Assignee changed from Eric Quach to Dante Le
Actions #10

Updated by Tracy Truong 5 months ago

  • Status changed from QA test to 완료(Done)

Confirmed by Eric

Actions #11

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #12

Updated by harry harry 4 months ago

  • Build env. changed from Staging to Prod
Actions #13

Updated by ziniy Kang 4 months ago

  • Status changed from 확인(Confirmed) to 완료성공(Resolve)

eric: prod check done.

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)