Project

General

Profile

Actions

기능(Feature) #189

closed

[Design] Create a new mobile introduction page for Channel.biz 닷비즈채널 소개 페이지 신규 생성

Added by ziniy Kang 10 months ago. Updated 5 months ago.

Status:
완료성공(Resolve)
Priority:
높음(High)
Assignee:
Start date:
05/08/2025
Due date:
05/08/2025
% Done:

100%

Estimated time:
1.00 h
Part:
DESIGN
Build env.:


Related issues

Related to OMH - 기능(Feature) #160: [Plan] Create a new mobile introduction page for Channel.biz 닷비즈채널 소개 페이지 신규 생성완료성공(Resolve)Lexi Kim05/07/202505/09/2025

Actions
Actions #2

Updated by ziniy Kang 10 months ago

  • Related to 기능(Feature) #160: [Plan] Create a new mobile introduction page for Channel.biz 닷비즈채널 소개 페이지 신규 생성 added
Actions #3

Updated by Eric Quach 10 months ago

  • Due date set to 05/08/2025
  • Status changed from 신규(New) to 완료(Done)
  • Start date set to 05/08/2025
  • % Done changed from 0 to 100
  • Estimated time set to 0.01 h
Actions #4

Updated by Eric Quach 10 months ago

  • Due date deleted (05/08/2025)
  • Status changed from 완료(Done) to 신규(New)
  • Start date deleted (05/08/2025)
Actions #5

Updated by Eric Quach 10 months ago

  • % Done changed from 100 to 0
  • Estimated time deleted (0.01 h)
Actions #6

Updated by ziniy Kang 10 months ago

  • File 닷비즈 모바일.fig added
Actions #7

Updated by ziniy Kang 10 months ago

  • Priority changed from 보통(Normal) to 높음(High)
Actions #8

Updated by Lexi Kim 10 months ago

  • File deleted (닷비즈 모바일.fig)
Actions #9

Updated by Lexi Kim 10 months ago

  • Tracker changed from 개선(improvement) to 기능(Feature)
  • Subject changed from [Design] Update the introduction page for the Channel.biz 닷비즈채널 소개 페이지 변경 to [Design] Create a new mobile introduction page for Channel.biz 닷비즈채널 소개 페이지 신규 생성
Actions #10

Updated by Eric Quach 10 months ago

  • Due date set to 05/08/2025
  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 05/08/2025
  • Estimated time set to 1.00 h
Actions #11

Updated by Lexi Kim 10 months ago

ziniy Kang wrote:

Figma Link
https://www.figma.com/design/9pFXSbzuAIhOaiprioqWfo/-SB--B2C-Improvement?node-id=1-95&t=cUZOcmb5rF0A52zg-1

The plan has changed from modifying the existing introduction page to newly creating one mobile page.
Please take this into account for your work. Thank you.

Actions #12

Updated by Eric Quach 10 months ago

  • Status changed from 진행(Doing) to 완료(Done)
  • % Done changed from 0 to 100
Actions #13

Updated by Eric Quach 10 months ago

  • Status changed from 완료(Done) to 피드백(Feedback)
  • Assignee changed from Eric Quach to Lexi Kim
Actions #14

Updated by Eric Quach 10 months ago

  • Status changed from 피드백(Feedback) to 완료(Done)
  • Assignee changed from Lexi Kim to Eric Quach
Actions #16

Updated by ziniy Kang 8 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)