Project

General

Profile

Actions

개선(improvement) #1713

closed

[MO/App] Hide footer on all screens except Main Home

Added by Lexi Kim 6 months ago. Updated 5 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
10/06/2025
Due date:
10/07/2025
% Done:

100%

Estimated time:
6.00 h
Part:
MO
Build env.:
Prod

Description

As-is
The footer is visible on all screens.

To-be
The footer should only be visible on the main home screen and hidden on all other screens.


Files

image.png (781 KB) image.png Lexi Kim, 09/24/2025 04:53 AM
Hide Footer.mp4 (4.71 MB) Hide Footer.mp4 Tracy Truong, 10/07/2025 07:38 AM
picture943-1.png (141 KB) picture943-1.png Tracy Truong, 10/07/2025 07:39 AM
picture943-2.png (112 KB) picture943-2.png Tracy Truong, 10/07/2025 07:39 AM
picture031-1.png (991 KB) picture031-1.png Tracy Truong, 10/09/2025 02:22 AM
picture031-2.png (709 KB) picture031-2.png Tracy Truong, 10/09/2025 02:22 AM
picture031-3.png (609 KB) picture031-3.png Tracy Truong, 10/09/2025 02:22 AM
Actions #1

Updated by ziniy Kang 5 months ago

  • Assignee changed from ziniy Kang to Joseph Vo
Actions #2

Updated by Joseph Vo 5 months ago

  • Assignee changed from Joseph Vo to harry harry
Actions #3

Updated by harry harry 5 months ago

  • Assignee changed from harry harry to Joo dev
Actions #4

Updated by Joo dev 5 months ago

  • Status changed from 신규(New) to 진행(Doing)
Actions #5

Updated by Joo dev 5 months ago

  • Due date set to 10/07/2025
  • Start date set to 10/06/2025
  • Estimated time set to 6.00 h
Actions #6

Updated by Joo dev 5 months ago

  • Status changed from 진행(Doing) to 완료(Done)
  • % Done changed from 0 to 100
  • Build env. set to Dev
Actions #7

Updated by Joo dev 5 months ago

  • Status changed from 완료(Done) to QA test
  • Assignee changed from Joo dev to Tracy Tran
  • Build env. changed from Dev to Staging
Actions #8

Updated by Tracy Truong 5 months ago

Checked on STAG, ok

Actions #9

Updated by Joo dev 5 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #10

Updated by Joo dev 5 months ago

  • Status changed from 확인(Confirmed) to QA test
  • Assignee changed from Joo dev to Tracy Tran
  • Build env. changed from Staging to Prod
Actions #11

Updated by Tracy Truong 5 months ago

Checked on Testfilght, ok

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)