Project

General

Profile

Actions

개선(improvement) #1579

closed

[Design] Update to the App Permission Notice screen

Added by Zia Han 6 months ago. Updated 5 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
09/17/2025
Due date:
09/17/2025
% Done:

100%

Estimated time:
Part:
DESIGN
Build env.:


Related issues

Copied from OMH - 개선(improvement) #1328: [Plan] Update to the App Permission Notice screen완료성공(Resolve)Zia Han09/16/202509/16/2025

Actions
Actions #1

Updated by Zia Han 6 months ago

Actions #2

Updated by Zia Han 6 months ago

  • Parent task deleted (#1328)
Actions #3

Updated by Zia Han 6 months ago

  • Subject changed from [Design] in-app permission notices 화면 변경 to [Design] Update to the App Permission Notice screen
  • Assignee changed from Zia Han to Eric Quach

Dear Eric Quach

  • For Ohmyhotel and Ohmytrip, the in-app permission notices page will be created identically, except for one text line in the Screen Details Notice.

Design Requests
0. Only Korean screen needs to be created (Korean version only).
1. Background color: white.
2. Please adjust the top margin above the text “앱 접근 권한 안내”.
Especially For OMT, please remove the company icon logo image.
3. Permission Items Icons: use existing ones if available.
For “Location”, use the existing icon if it exists, otherwise create a new one.
4. Please apply text styles (bold, size, color, etc.) to show clear hierarchy of information.
5. At the bottom, separate only the description area with color or a line.
Keep the rest of the screen clean with a white background (no lines or shading).

Figma : https://www.figma.com/design/9a8yeIioEsseseoFCYFwp0/OMH-Main-2%EC%B0%A8-%EA%B0%9C%ED%8E%B8?node-id=105-248&t=qnjXa8eFH8VuBnnG-4

Actions #4

Updated by Eric Quach 6 months ago

  • Start date set to 09/17/2025
Actions #5

Updated by Eric Quach 6 months ago

  • Status changed from 신규(New) to 진행(Doing)
Actions #6

Updated by Eric Quach 6 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
  • Assignee changed from Eric Quach to Zia Han
  • % Done changed from 0 to 100
Actions #7

Updated by Eric Quach 6 months ago

  • Due date set to 09/17/2025
Actions #8

Updated by Zia Han 6 months ago

  • Status changed from 피드백(Feedback) to 완료(Done)
  • Assignee changed from Zia Han to Eric Quach
Actions #10

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)