Project

General

Profile

Actions

결함(Bug) #1350

closed

결함(Bug) #1329: Login issue

[PC] Scrollbar Display Issue on Login/Sign-Up Popup

Added by ziniy Kang 6 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
09/17/2025
Due date:
09/18/2025
% Done:

100%

Estimated time:
Part:
Build env.:
Prod

Description

1. Có một số màn hình máy hiển thị Scrollbar trên pop up Login/Sign up 

Trên plan & design ko có hiển thị scrollbar này (check lại design&plan)→ remove scrollbar


Files

picture204-1.png (107 KB) picture204-1.png ziniy Kang, 09/01/2025 06:22 AM
picture206-1.png (157 KB) picture206-1.png PC Tracy Truong, 09/22/2025 03:58 AM
picture206-2.png (135 KB) picture206-2.png Laptop Tracy Truong, 09/22/2025 03:58 AM
picture387-1.png (565 KB) picture387-1.png Tracy Truong, 09/23/2025 04:52 AM
Actions #2

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to Tri Thien (Edward) Mai
Actions #3

Updated by harry harry 6 months ago

  • Assignee changed from Tri Thien (Edward) Mai to Joo dev
Actions #4

Updated by Joo dev 6 months ago

  • Assignee changed from Joo dev to Dante Le
Actions #5

Updated by Dante Le 6 months ago

  • Due date set to 09/17/2025
  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 09/17/2025
Actions #6

Updated by Dante Le 6 months ago

  • Due date changed from 09/17/2025 to 09/18/2025
  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Dante Le to Tracy Tran
  • % Done changed from 0 to 100
  • Build env. set to Dev
Actions #8

Updated by Tracy Truong 6 months ago

Checked on Dev, ok

Actions #9

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #10

Updated by Dante Le 6 months ago

  • Build env. changed from Dev to Staging
Actions #11

Updated by ziniy Kang 6 months ago

  • Status changed from 확인(Confirmed) to QA test
  • Assignee changed from Dante Le to Tracy Truong
Actions #12

Updated by Tracy Truong 6 months ago

Checked on STAG, ok

Actions #13

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #14

Updated by harry harry 4 months ago

  • Build env. changed from Staging to Prod
Actions #15

Updated by ziniy Kang 4 months ago

  • Status changed from 확인(Confirmed) to 완료성공(Resolve)

prod check done.

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)