Project

General

Profile

Actions

결함(Bug) #1295

closed

VOC support #1303: * New main page issue

[MO] Modify the left/right margins and spacing of the 3 buttons.

Added by Lexi Kim 6 months ago. Updated 6 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
08/29/2025
Due date:
08/29/2025
% Done:

100%

Estimated time:
Part:
FE
Build env.:
Prod

Description

3개 버튼의 좌/우 여백과 간격을 디자인과 동일하게 수정한다.
Modify the left/right margins and spacing of the three buttons to be the same as the design.


SB: https://www.figma.com/design/Q4neTs7DpLijH3DZo6dVvm/Main-Renewal-Project?node-id=1765-8308&t=l4xhHI5RwG6uMGCK-1

The left/right margins of the 3 buttons are different from the design. Please set them to 16px each. Please also correct the spacing between the buttons.


Files

image.png (371 KB) image.png Lexi Kim, 08/28/2025 02:06 AM
image.png (187 KB) image.png Tracy Truong, 09/08/2025 04:39 AM
picture682-1.png (281 KB) picture682-1.png Tracy Truong, 09/11/2025 04:31 AM
Actions #1

Updated by Lexi Kim 6 months ago

  • Parent task set to #1303
Actions #2

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to John Lee
Actions #3

Updated by John Lee 6 months ago

  • Description updated (diff)
Actions #4

Updated by John Lee 6 months ago

  • Status changed from 신규(New) to 진행(Doing)
Actions #5

Updated by John Lee 6 months ago

  • % Done changed from 0 to 100
Actions #6

Updated by ziniy Kang 6 months ago

  • Due date set to 08/29/2025
  • Start date set to 08/29/2025
Actions #7

Updated by John Lee 6 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
  • Assignee changed from John Lee to Lexi Kim
  • Build env. set to Dev
Actions #8

Updated by Lexi Kim 6 months ago

  • Status changed from 피드백(Feedback) to 진행(Doing)
  • Assignee changed from Lexi Kim to John Lee

Unmodified on dev. (checked on September 1st)

Actions #9

Updated by John Lee 6 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
  • Assignee changed from John Lee to Lexi Kim

hi Lexi Kim, please help me retest on dev. Thank you!

Actions #10

Updated by ziniy Kang 6 months ago

  • Status changed from 피드백(Feedback) to QA test
  • Assignee changed from Lexi Kim to Tracy Tran
Actions #11

Updated by Tracy Tran 6 months ago

  • Assignee changed from Tracy Tran to Tracy Truong
Actions #12

Updated by Tracy Truong 6 months ago

  • File image.png image.png added
  • Status changed from QA test to 완료(Done)
  • Assignee changed from Tracy Truong to John Lee

checked on Dev (MoWeb), ok

Actions #13

Updated by John Lee 6 months ago

  • Status changed from 완료(Done) to QA test
  • Assignee changed from John Lee to Tracy Tran
  • Build env. changed from Dev to Prod
Actions #14

Updated by Tracy Tran 6 months ago

  • Assignee changed from Tracy Tran to Tracy Truong
Actions #15

Updated by Tracy Truong 6 months ago

Checked on Prod (MoApp), ok

Actions #16

Updated by Tracy Truong 6 months ago

  • Status changed from QA test to 완료(Done)
Actions #17

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)