Project

General

Profile

Actions

VOC support #1183

closed

Check lại các mail của TL lincon

Added by ziniy Kang 7 months ago. Updated 5 months ago.

Status:
완료성공(Resolve)
Priority:
높음(High)
Assignee:
Target version:
Start date:
09/22/2025
Due date:
09/22/2025
% Done:

100%

Estimated time:
4.00 h
Part:
Build env.:
Prod

Description

1. Non-mapping
2. Stoped sale
3. Changed room type mapping from TL-Lincoln


Files

Actions #1

Updated by ziniy Kang 6 months ago

  • Assignee changed from ziniy Kang to Daniel Do
Actions #2

Updated by ziniy Kang 6 months ago

  • Priority changed from 보통(Normal) to 높음(High)
Actions #3

Updated by Daniel Do 6 months ago

  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 09/22/2025
  • Estimated time set to 4.00 h
Actions #4

Updated by Daniel Do 6 months ago

Actions #5

Updated by ziniy Kang 6 months ago

  • Assignee changed from Daniel Do to ziniy Kang
Actions #6

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to 진행(Doing)
  • Assignee changed from ziniy Kang to Daniel Do

Cần update code.

Actions #7

Updated by Daniel Do 5 months ago

1. Skip notifications when room status = Sale Stopped
2. Update end-user email content for meaning.

Actions #8

Updated by Daniel Do 5 months ago

Finish deployment on PROD

Actions #9

Updated by Daniel Do 5 months ago

  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Daniel Do to Tracy Truong
Actions #10

Updated by Tracy Tran 5 months ago

  • Assignee changed from Tracy Truong to Tracy Tran
Actions #11

Updated by Tracy Tran 5 months ago

  • Status changed from QA test to 완료성공(Resolve)
  • Assignee changed from Tracy Tran to Daniel Do
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)