Project

General

Profile

Actions

결함(Bug) #262

closed

[Issue-Alitrip] HOTEL_NOT_EXIST

Added by Dan Hoang 10 months ago. Updated 9 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
05/16/2025
Due date:
05/16/2025
% Done:

100%

Estimated time:
4.00 h
Spent time:
Part:
Build env.:
Prod

Description

Log as below:
15:15:25.480^_^28427952^_^taobao.xhotel.roomtype.update^_^172.17.0.3^_^Linux^_^194^_^http://gw.api.taobao.com/router/rest^_^method=taobao.xhotel.roomtype.update&max_occupancy=3&session=6101a20159fe817be5d59d887cd613338d69c2b503e00de2206798745872&bed_type=%E5%8F%8C%E4%BA%BA%E5%BA%8A&sign=8EBC2486FAA876DABFD05E479A5AA1357E183155E1FF11450ABF8CEA0454128E&format=json&hotel_code=1001369&outer_id=RAA15654&name_e=Seaside+Suite+Ocean+View&app_key=28427952&partner_id=top-sdk-java-20220919&v=2.0&vendor=ohmyhotel&sign_method=hmac-sha256&name=Seaside+Suite+Ocean+View&timestamp=2025-05-14+15%3A15%3A25&status=0^_^{"error_response":{"code":15,"msg":"Remote service error","sub_code":"isv.invalid-parameter:HOTEL_NOT_EXIST","sub_msg":"酒店不存在","request_id":"16lgdjmml8pvw"}}

Actions #1

Updated by calvin dev 10 months ago

  • Estimated time set to 5.00 h
Actions #2

Updated by calvin dev 10 months ago

  • Status changed from 신규(New) to 진행(Doing)
  • Assignee set to calvin dev
Actions #3

Updated by calvin dev 10 months ago

  • Status changed from 진행(Doing) to 완료(Done)
  • % Done changed from 0 to 90
  • Estimated time changed from 5.00 h to 4.00 h
  • Build env. set to Dev
Actions #4

Updated by ziniy Kang 10 months ago

task này done chưa em?

Actions #5

Updated by calvin dev 10 months ago

  • Build env. changed from Dev to Staging

IT will testing on staging, just remove log.

Actions #6

Updated by calvin dev 10 months ago

  • Due date set to 05/16/2025
  • Start date set to 05/16/2025
Actions #7

Updated by calvin dev 10 months ago

Testing done on staging, prepare to deploy on PROD

Actions #8

Updated by calvin dev 10 months ago

  • Build env. changed from Staging to Prod

Done on Prod

Actions #9

Updated by calvin dev 10 months ago

  • % Done changed from 90 to 100
Actions #10

Updated by ziniy Kang 9 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)