Project

General

Profile

Actions

결함(Bug) #1913

closed

결함(Bug) #1329: Login issue

Password Reset & Login Screen – Email Color Design Update

Added by ziniy Kang 5 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
10/14/2025
Due date:
10/14/2025
% Done:

100%

Estimated time:
Part:
Build env.:
Prod

Description

1. Change text: > 새 비밀번호 설정
2. (design)e-mail address should be displayed as orange color.


Files

picture114-1.png (92.1 KB) picture114-1.png ziniy Kang, 10/14/2025 01:22 AM
picture638-1.png (333 KB) picture638-1.png harry harry, 10/14/2025 02:30 AM
picture054-1.png (91.6 KB) picture054-1.png Tracy Truong, 10/14/2025 09:13 AM
picture054-2.png (66.4 KB) picture054-2.png Tracy Truong, 10/14/2025 09:13 AM
picture054-3.png (63 KB) picture054-3.png Tracy Truong, 10/14/2025 09:13 AM
picture054-4.png (176 KB) picture054-4.png Tracy Truong, 10/14/2025 09:13 AM
picture054-5.png (265 KB) picture054-5.png Tracy Truong, 10/14/2025 09:13 AM
picture054-6.png (66.7 KB) picture054-6.png Tracy Truong, 10/14/2025 09:13 AM
Actions #1

Updated by Joseph Vo 5 months ago

  • Assignee changed from Joseph Vo to harry harry
Actions #2

Updated by harry harry 5 months ago

  • Assignee changed from harry harry to John Lee
Actions #3

Updated by harry harry 5 months ago

  • Assignee changed from John Lee to Dante Le
Actions #4

Updated by harry harry 5 months ago

Kelly has been request update text Lexi Kim. pls change tracker Bug -> improvement

Actions #5

Updated by Lexi Kim 5 months ago

Dear harry harry,
Please proceed with request number 1. Ignore number 2.

Actions #6

Updated by harry harry 5 months ago

Dante Le pls check comment and process

Actions #7

Updated by Dante Le 5 months ago

  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 10/14/2025
Actions #8

Updated by Dante Le 5 months ago

  • Due date set to 10/14/2025
  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Dante Le to Tracy Truong
  • % Done changed from 0 to 100
  • Build env. set to Staging
Actions #9

Updated by Tracy Truong 5 months ago

Checked on STAG, ok

Actions #10

Updated by Lexi Kim 5 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
  • Assignee changed from Tracy Truong to Dante Le

stg test done.

Actions #11

Updated by harry harry 4 months ago

  • Build env. changed from Staging to Prod
Actions #12

Updated by ziniy Kang 4 months ago

  • Status changed from 확인(Confirmed) to 완료(Done)
  • Assignee changed from Dante Le to Lexi Kim
Actions #13

Updated by Lexi Kim 4 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
  • Assignee changed from Lexi Kim to Dante Le

prod test done.

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)