Project

General

Profile

Actions

QA #1667

closed

QA #1518: New Log-in / Sign up process - QA test cases

MO - Lack of Additional Information field

Added by Tracy Truong 6 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
높음(High)
Assignee:
Start date:
09/22/2025
Due date:
09/23/2025
% Done:

100%

Estimated time:
Build env.:
Prod


Files

picture790-1.png (76.6 KB) picture790-1.png Tracy Truong, 09/19/2025 08:57 AM
picture184-1.png (194 KB) picture184-1.png Tracy Truong, 09/22/2025 09:35 AM
picture184-2.png (177 KB) picture184-2.png Tracy Truong, 09/22/2025 09:35 AM
picture184-3.png (181 KB) picture184-3.png Tracy Truong, 09/22/2025 09:35 AM
picture080-1.png (66.7 KB) picture080-1.png John Lee, 09/22/2025 10:00 AM
picture016-1.png (458 KB) picture016-1.png Tracy Truong, 10/07/2025 04:59 AM
picture247-1.png (83.8 KB) picture247-1.png Tracy Truong, 11/03/2025 01:50 AM
Actions #1

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to John Lee
Actions #2

Updated by Tracy Tran 6 months ago

  • Priority changed from 보통(Normal) to 높음(High)
Actions #3

Updated by John Lee 6 months ago

  • Status changed from 신규(New) to 진행(Doing)
Actions #4

Updated by John Lee 6 months ago

  • Status changed from 진행(Doing) to 피드백(Feedback)
  • Assignee changed from John Lee to Tracy Truong

1. Nhờ em note giúp anh trong description as-is và to-be đang bị gì nhé.
2. Cho a xin hotel code e đang select là hotel nào.
Thank em Tracy Truong

Actions #5

Updated by Tracy Truong 6 months ago

John Lee wrote in #note-4:

1. Nhờ em note giúp anh trong description as-is và to-be đang bị gì nhé.
2. Cho a xin hotel code e đang select là hotel nào.
Thank em Tracy Truong

1/
As is: Hiện tại đang thiếu phần bôi vàng
To be: thêm phần như em bôi vàng bên dưới ảnh capture
2/ Test hotel 1/ Tracy's Test Hotel

Actions #6

Updated by John Lee 6 months ago

  • Status changed from 피드백(Feedback) to 진행(Doing)
Actions #7

Updated by John Lee 6 months ago

  • File picture080-1.png picture080-1.png added
  • Status changed from 진행(Doing) to QA test
  • Assignee changed from John Lee to Tracy Truong
  • % Done changed from 0 to 100

Hiện tại do chưa setup caution trong description cho hotel nên không hiển thị. Em vào web admin chỗ này setup để nó có thể hiện thị lên nha.
A đã setup sẵn cho hotel này, em có thể check lại.

Actions #8

Updated by Tracy Truong 6 months ago

  • Status changed from QA test to 완료성공(Resolve)
  • Assignee changed from Tracy Truong to John Lee

Checked done.
Thank you anh

Actions #9

Updated by Tracy Truong 6 months ago

  • Status changed from 완료성공(Resolve) to 완료(Done)
Actions #10

Updated by John Lee 6 months ago

  • Build env. set to Dev
Actions #11

Updated by ziniy Kang 6 months ago

  • Due date set to 09/23/2025
  • Start date set to 09/22/2025
Actions #12

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #13

Updated by John Lee 5 months ago

  • Status changed from 확인(Confirmed) to QA test
  • Assignee changed from John Lee to Tracy Truong
  • Build env. changed from Dev to Staging
Actions #14

Updated by Tracy Truong 5 months ago

Checked done

Actions #15

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #16

Updated by John Lee 4 months ago

  • Status changed from 확인(Confirmed) to QA test
Actions #17

Updated by John Lee 4 months ago

  • Build env. changed from Staging to Prod
Actions #18

Updated by John Lee 4 months ago

  • Assignee changed from John Lee to Tracy Truong
Actions #19

Updated by Tracy Truong 4 months ago

Checked, done

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)