Project

General

Profile

Actions

QA #1658

closed

QA #1518: New Log-in / Sign up process - QA test cases

(MO) Sign up/ Login popup - terms of use notice should be located at the bottom of the page.

Added by Tracy Truong 6 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
09/19/2025
Due date:
09/23/2025
% Done:

100%

Estimated time:
1.00 h
Build env.:
Prod

Description


Files

picture019-1.png (46.1 KB) picture019-1.png Tracy Truong, 09/19/2025 07:29 AM
Image (4).jpeg (152 KB) Image (4).jpeg Tracy Tran, 09/25/2025 10:54 AM
Actions #1

Updated by Tracy Truong 6 months ago

  • Start date set to 09/19/2025
Actions #2

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to Joo dev
Actions #3

Updated by Joo dev 6 months ago

  • Due date set to 09/23/2025
  • Status changed from 신규(New) to 완료(Done)
  • % Done changed from 0 to 90
  • Estimated time set to 1.00 h
Actions #4

Updated by Joo dev 6 months ago

  • % Done changed from 90 to 100
  • Build env. set to Staging
Actions #5

Updated by ziniy Kang 6 months ago

  • Description updated (diff)
Actions #6

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to QA test
  • Assignee changed from Joo dev to Tracy Tran
Actions #7

Updated by Tracy Tran 6 months ago

Checked on Stagin OK

Actions #8

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #9

Updated by Joo dev 4 months ago

  • Build env. changed from Staging to Prod
Actions #10

Updated by Joo dev 4 months ago

  • Status changed from 확인(Confirmed) to 완료(Done)
Actions #11

Updated by ziniy Kang 4 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)

prod check done.

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)