Project

General

Profile

Actions

QA #1633

closed

QA #1518: New Log-in / Sign up process - QA test cases

Inconsistent login pop up

Added by Tracy Truong 6 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
10/10/2025
Due date:
10/10/2025
% Done:

100%

Estimated time:
1.00 h
Build env.:
Prod

Description

When go to OMH page & click Log in, pop up 1-1 appear
Sign in & after that log out, pop up 1-2 appear


Files


Related issues

Related to OMH - QA #2178: [PROD -MO] Page is displayed incorrectly after user logged out완료성공(Resolve)Dante Le01/12/202601/12/2026

Actions
Actions #1

Updated by Tracy Truong 6 months ago

  • Start date set to 09/18/2025
Actions #2

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to Mon Nguyen
Actions #3

Updated by harry harry 6 months ago

  • Assignee changed from Mon Nguyen to Joo dev
Actions #4

Updated by Joo dev 6 months ago

Lexi Kim After the user logs out, which screen will they be redirected to?

Actions #5

Updated by Joo dev 6 months ago

  • Due date set to 09/22/2025
  • Status changed from 신규(New) to 피드백(Feedback)
  • Assignee changed from Joo dev to Lexi Kim
  • Estimated time set to 1.00 h
Actions #6

Updated by Lexi Kim 6 months ago

  • File image.png image.png added
  • Status changed from 피드백(Feedback) to 진행(Doing)
  • Assignee changed from Lexi Kim to Tracy Truong

When a user logs out while using the site, everyone goes to the home screen regardless of which page they are on.

https://www.figma.com/design/vOGs1fRewULwCFidZcWR69/Login---Sign-up-process?node-id=1880-7949&t=Irk846lXuqWEfxKI-1

Actions #7

Updated by ziniy Kang 6 months ago

  • Due date deleted (09/22/2025)
Actions #8

Updated by ziniy Kang 5 months ago

  • Assignee changed from Tracy Truong to Joo dev
Actions #9

Updated by Joo dev 5 months ago

  • Due date set to 10/10/2025
  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Joo dev to Tracy Tran
  • Start date changed from 09/18/2025 to 10/10/2025
Actions #11

Updated by ziniy Kang 5 months ago

  • % Done changed from 0 to 100
Actions #12

Updated by Joo dev 5 months ago

  • Build env. set to Staging
Actions #13

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #14

Updated by Joo dev 4 months ago

  • Build env. changed from Staging to Prod
Actions #15

Updated by Joo dev 4 months ago

  • Status changed from 확인(Confirmed) to 완료(Done)
Actions #16

Updated by ziniy Kang 4 months ago

  • Status changed from 완료(Done) to QA test
  • Assignee changed from Joo dev to Tracy Tran
Actions #17

Updated by Tracy Truong 4 months ago

Pc: ok
MO: failed => already made new task on http://redmine.ohmytrip.com/issues/2178

Actions #18

Updated by Tracy Truong 4 months ago

  • Related to QA #2178: [PROD -MO] Page is displayed incorrectly after user logged out added
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)