Project

General

Profile

Actions

개선(improvement) #1405

closed

VOC support #1303: * New main page issue

Change the text size depending on the language

Added by ziniy Kang 6 months ago. Updated 6 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
09/08/2025
Due date:
09/08/2025
% Done:

100%

Estimated time:
1.00 h
Part:
FE
Build env.:
Prod


Files

image.png (2.3 MB) image.png Lexi Kim, 09/04/2025 06:14 AM

Related issues

Copied from OMH - 개선(improvement) #1400: [Design] Change the text size depending on the language완료성공(Resolve)Eric Quach09/04/202509/04/2025

Actions
Actions #1

Updated by ziniy Kang 6 months ago

Actions #2

Updated by ziniy Kang 6 months ago

  • Description updated (diff)
Actions #3

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to Joo dev
Actions #4

Updated by Joo dev 6 months ago

  • Due date set to 09/08/2025
  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 09/08/2025
  • % Done changed from 0 to 100
  • Estimated time set to 1.00 h
Actions #5

Updated by Joo dev 6 months ago

  • Status changed from 진행(Doing) to 완료(Done)
Actions #6

Updated by Joo dev 6 months ago

  • Build env. set to Staging
Actions #7

Updated by ziniy Kang 6 months ago

  • Assignee changed from Joo dev to Lexi Kim

STG check done.

Actions #8

Updated by Eric Quach 6 months ago

  • Assignee changed from Lexi Kim to Joo dev
Actions #9

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #10

Updated by Joo dev 6 months ago

  • Status changed from 확인(Confirmed) to 완료(Done)
  • Build env. changed from Staging to Prod
Actions #11

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)

prod check done.

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)