Project

General

Profile

Actions

개선(improvement) #1301

closed

개선(improvement) #1200: * 오마이호텔 기능 오류 최종 점검 / Final check of OMH system errors

[PC/MO] The entire title of the FAQ should be displayed.

Added by Lexi Kim 6 months ago. Updated 6 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
09/03/2025
Due date:
09/03/2025
% Done:

100%

Estimated time:
1.00 h
Part:
FE
Build env.:
Prod


Files

picture213-1.png (150 KB) picture213-1.png ziniy Kang, 09/03/2025 07:30 AM
picture796-1.png (59.3 KB) picture796-1.png Tracy Truong, 09/09/2025 03:36 AM
picture796-2.png (73.1 KB) picture796-2.png Tracy Truong, 09/09/2025 03:36 AM

Subtasks 1 (0 open1 closed)

개선(improvement) #1300: [Design] The entire title of the FAQ should be displayed.완료성공(Resolve)Eric Quach09/03/202509/03/2025

Actions
Actions #1

Updated by Lexi Kim 6 months ago

Actions #2

Updated by ziniy Kang 6 months ago

Actions #3

Updated by Lexi Kim 6 months ago

  • Assignee changed from Lexi Kim to Joseph Vo

Sep 4 design confirmed. Please start this task. Thank you.

Actions #4

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to Joo dev
Actions #5

Updated by Joo dev 6 months ago

  • Status changed from 신규(New) to 완료(Done)
  • Estimated time set to 1.00 h
  • Build env. set to Staging
Actions #6

Updated by Joo dev 6 months ago

  • Assignee changed from Joo dev to Tracy Truong
Actions #7

Updated by Tracy Truong 6 months ago

Checked on STAG, ok

Actions #8

Updated by Joo dev 6 months ago

  • Build env. changed from Staging to Prod
Actions #9

Updated by ziniy Kang 6 months ago

  • Assignee changed from Joo dev to Lexi Kim
Actions #10

Updated by Lexi Kim 6 months ago

prod test done. sep 18

Actions #11

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
  • Assignee changed from Lexi Kim to Joo dev
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)