Project

General

Profile

Actions

개선(improvement) #1285

closed

개선(improvement) #1200: * 오마이호텔 기능 오류 최종 점검 / Final check of OMH system errors

Sort icon (horizontal lines with arrows)

Added by ziniy Kang 6 months ago. Updated 5 months ago.

Status:
완료성공(Resolve)
Priority:
긴급(Emergency)
Assignee:
Start date:
08/28/2025
Due date:
08/28/2025
% Done:

100%

Estimated time:
1.00 h
Part:
FE
Build env.:
Prod

Description

Filter icon cố định khi load hotel list.


Files

picture185-1.png (108 KB) picture185-1.png ziniy Kang, 08/27/2025 08:45 AM
image.png (312 KB) image.png Lexi Kim, 08/27/2025 08:57 AM
Sort icon.mp4 (2.2 MB) Sort icon.mp4 Tracy Truong, 10/10/2025 03:16 AM
Actions #1

Updated by ziniy Kang 6 months ago

  • Description updated (diff)
  • Assignee changed from ziniy Kang to Joseph Vo
  • Priority changed from 보통(Normal) to 긴급(Emergency)
Actions #2

Updated by Lexi Kim 6 months ago

in red box positoin, floating button should be fixed.

Actions #3

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to Joo dev
Actions #4

Updated by Joseph Vo 6 months ago

Dear ziniy Kang Lexi Kim is it final? I saw you're discussing with Mr Tate
Some hotel content can be hidden by this filter

Actions #5

Updated by Lexi Kim 6 months ago

Dear Joseph Vo
Please put the filter in the red-box position.
We're also aware of the issue that some hotels are hidden by the filter, and we'll fix it later.
Thank you.

Actions #6

Updated by Joo dev 6 months ago

  • Status changed from 신규(New) to 진행(Doing)
Actions #7

Updated by Joo dev 6 months ago

  • Start date set to 08/28/2025
Actions #8

Updated by ziniy Kang 6 months ago

  • Description updated (diff)
Actions #9

Updated by Joo dev 6 months ago

  • Due date set to 08/28/2025
  • Status changed from 진행(Doing) to 완료(Done)
  • % Done changed from 0 to 100
  • Estimated time set to 1.00 h
  • Part set to FE
  • Build env. set to Staging
Actions #10

Updated by Lexi Kim 6 months ago

  • Parent task set to #1200
Actions #11

Updated by ziniy Kang 6 months ago

stg test done.

Actions #12

Updated by ziniy Kang 6 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #13

Updated by Joo dev 6 months ago

  • Status changed from 확인(Confirmed) to 완료(Done)
  • Build env. changed from Staging to Prod
Actions #14

Updated by ziniy Kang 6 months ago

  • Assignee changed from Joo dev to Lexi Kim
Actions #15

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to QA test
  • Assignee changed from Lexi Kim to Tracy Tran

IOS 16promax check done.
need to check small size phone.

Actions #16

Updated by Tracy Truong 5 months ago

IOS 13 promax - check on Testflight - done
Mo web:
IOS 12 pro, XR, SE
AOS: Galaxy S8+

Actions #17

Updated by Tracy Truong 5 months ago

  • Status changed from 완료(Done) to 완료성공(Resolve)
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)