Project

General

Profile

Actions

개선(improvement) #1261

closed

기능(Feature) #1110: * EMAIL TEMPLATE CHANGE

8_[Ohmyhotel] Sign up compete_verify link

Added by ziniy Kang 7 months ago. Updated 4 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
09/04/2025
Due date:
09/29/2025
% Done:

100%

Estimated time:
Part:
Build env.:
Prod

Description


Files

picture997-1.png (89.8 KB) picture997-1.png ziniy Kang, 08/26/2025 05:26 AM
picture152-1.png (304 KB) picture152-1.png KR ver Tracy Truong, 09/18/2025 10:09 AM
picture152-2.png (77 KB) picture152-2.png KR ver Tracy Truong, 09/18/2025 10:09 AM
picture152-3.png (352 KB) picture152-3.png ENG ver Tracy Truong, 09/18/2025 10:09 AM
picture152-4.png (424 KB) picture152-4.png Tracy Truong, 09/18/2025 10:09 AM
picture653-2.png (98.5 KB) picture653-2.png Eng Tracy Truong, 09/24/2025 02:20 AM
picture653-3.png (58.5 KB) picture653-3.png Design Tracy Truong, 09/24/2025 02:20 AM
picture653-5.png (82.3 KB) picture653-5.png KR Tracy Truong, 09/24/2025 02:20 AM
picture035-1.png (41.7 KB) picture035-1.png ziniy Kang, 09/25/2025 08:28 AM
picture678-1.png (71.7 KB) picture678-1.png Tracy Truong, 09/30/2025 03:41 AM
picture678-2.png (86.5 KB) picture678-2.png Tracy Truong, 09/30/2025 03:41 AM
picture678-3.png (78 KB) picture678-3.png Tracy Truong, 09/30/2025 03:41 AM
picture678-5.png (89.7 KB) picture678-5.png Tracy Truong, 09/30/2025 03:41 AM
picture678-6.png (33.7 KB) picture678-6.png Tracy Truong, 09/30/2025 03:41 AM
picture814-1.png (87.1 KB) picture814-1.png Tracy Truong, 10/01/2025 07:20 AM
picture814-2.png (86.9 KB) picture814-2.png Tracy Truong, 10/01/2025 07:20 AM
picture322-1.png (109 KB) picture322-1.png Tracy Truong, 10/15/2025 08:54 AM
picture322-2.png (468 KB) picture322-2.png Tracy Truong, 10/15/2025 08:54 AM
picture290-2.png (39.5 KB) picture290-2.png Tracy Truong, 10/15/2025 09:05 AM
picture290-3.png (53.9 KB) picture290-3.png Tracy Truong, 10/15/2025 09:05 AM
picture660-1.png (123 KB) picture660-1.png Tracy Truong, 10/17/2025 02:57 AM
picture660-2.png (73.1 KB) picture660-2.png Tracy Truong, 10/17/2025 02:57 AM
picture660-3.png (70.3 KB) picture660-3.png Tracy Truong, 10/17/2025 02:57 AM
picture660-4.png (95.7 KB) picture660-4.png Tracy Truong, 10/17/2025 02:57 AM
picture660-5.png (68.7 KB) picture660-5.png Tracy Truong, 10/17/2025 02:57 AM
picture660-6.png (68.7 KB) picture660-6.png Tracy Truong, 10/17/2025 02:57 AM
picture249-1.png (96.9 KB) picture249-1.png Tracy Truong, 11/05/2025 04:15 AM
picture249-3.png (117 KB) picture249-3.png Tracy Truong, 11/05/2025 04:15 AM
picture249-4.png (549 KB) picture249-4.png Tracy Truong, 11/05/2025 04:15 AM
picture249-5.png (500 KB) picture249-5.png Tracy Truong, 11/05/2025 04:15 AM
picture249-6.png (109 KB) picture249-6.png Tracy Truong, 11/05/2025 04:15 AM
picture249-8.png (160 KB) picture249-8.png Tracy Truong, 11/05/2025 04:15 AM

Related issues

Related to OMH - QA #1971: [STG] Email template/UI inconsistent between PC action and MO view완료성공(Resolve)harry harry10/30/202510/30/2025

Actions
Related to OMH - 개선(improvement) #2158: [Design] Adjust Text for Email Verification Page (Expired/Already Verified Case)완료성공(Resolve)Eric Quach10/31/202510/31/2025

Actions
Related to OMH - QA #2204: [PROD] Delete hyperlink of footer in all MO email template중단 (Stop)Tracy Truong11/06/2025

Actions
Related to OMH - QA #2034: Change all phone numbers as below in the footer section of the email template.완료성공(Resolve)Joo dev10/30/202510/30/2025

Actions
Actions #1

Updated by ziniy Kang 7 months ago

  • Tracker changed from 기능(Feature) to 개선(improvement)
Actions #3

Updated by Joseph Vo 6 months ago

  • Assignee changed from Joseph Vo to John Lee
Actions #4

Updated by Dante Le 6 months ago

  • Assignee changed from John Lee to Dante Le
Actions #5

Updated by Dante Le 6 months ago

  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 09/04/2025
Actions #6

Updated by Dante Le 6 months ago

  • Due date set to 09/08/2025
  • Status changed from 진행(Doing) to 완료(Done)
  • % Done changed from 0 to 100
Actions #7

Updated by Dante Le 6 months ago

  • Build env. set to Dev
Actions #8

Updated by Dante Le 6 months ago

  • Assignee changed from Dante Le to Tracy Tran
Actions #9

Updated by Dante Le 6 months ago

  • Status changed from 완료(Done) to QA test
Actions #10

Updated by Tracy Tran 6 months ago

  • Assignee changed from Tracy Tran to Tracy Truong
Actions #11

Updated by Tracy Truong 6 months ago

Figma: https://www.figma.com/design/0x5UMVnHNR7eo4sbHoy7Gn/Email-Template?node-id=215-1545&t=pNRR8Ux8CG2yEWPu-1
1: Delete Bold format of OhmyhotelnCo.,Ltd (both ver)
2: Delete "(" before text OhmyhotelnCo.,Ltd (ENG ver)
3: Lack of Italic format in footer text
Template verification failed can not test at the moment, need to waiting verify link is invalid. Will re-test later

Actions #12

Updated by Dante Le 6 months ago

  • Status changed from 완료실패(Failed) to QA test
  • Assignee changed from Dante Le to Tracy Truong
  • Build env. changed from Dev to Staging

Dear Tracy Truong
Please verify with Mr. Eric’s final design at the following link: https://www.figma.com/design/rKpXzV8hRJIgtVK4QtJqi8/B2C--B2B?node-id=9008-2854&p=f&t=J1q87DYTSXZLIz54-0
And this function has been reflected on STG, so please test in the STG environment.

Actions #13

Updated by Tracy Truong 6 months ago

ENG/KR Version:
"The verification link is valid for 7 days. If you did not request verification, please disregard this email." need to center alignment and line break after word "7days"
Please recheck

Actions #14

Updated by Tracy Truong 6 months ago

  • File deleted (picture653-4.png)
Actions #15

Updated by Dante Le 6 months ago

  • Status changed from 완료실패(Failed) to 피드백(Feedback)
  • Assignee changed from Dante Le to Lexi Kim

hi Lexi Kim I have a question. Currently, when registering with email, the system does not send a confirmation email, but when registering with social login, it does send an email using a different template. I would like to confirm whether this new verify email template should apply only to email registrations, or also to social registrations?

Actions #16

Updated by ziniy Kang 6 months ago

  • Assignee changed from Lexi Kim to Dante Le

1.Login bằng email: sử dụng template mới.
2.Social login: tạm thời sử dụng email template cũ. Sẽ plan email template riêng dành cho Social login.

Actions #17

Updated by Dante Le 6 months ago

  • Status changed from 피드백(Feedback) to QA test
  • Assignee changed from Dante Le to Tracy Tran
ENG/KR Version:
"The verification link is valid for 7 days. If you did not request verification, please disregard this email." need to center alignment and line break after word "7days" 
Please recheck

Dear Tracy Tran please test again on STG
Actions #18

Updated by Zia Han 6 months ago

Hello, Eric Quach
I'd like to request a design update for the email verification success and failure screens.
No development changes are needed — just the text in the design should be revised.
Of course, it would applied to web and app both.

Figma : https://www.figma.com/design/0x5UMVnHNR7eo4sbHoy7Gn/Email-Template?node-id=215-1545&t=22CYtKBRC7cSJzDZ-1

cc. Dante Le, @Tracy tran, ziniy Kang

Actions #19

Updated by ziniy Kang 6 months ago

Actions #20

Updated by Eric Quach 6 months ago

  • Status changed from 진행(Doing) to 완료(Done)
Actions #21

Updated by Zia Han 6 months ago

  • Status changed from 완료(Done) to 피드백(Feedback)
  • Assignee changed from Eric Quach to Zia Han
Actions #22

Updated by Zia Han 6 months ago

  • Status changed from 피드백(Feedback) to 진행(Doing)
  • Assignee changed from Zia Han to Dante Le
Actions #23

Updated by ziniy Kang 6 months ago

  • Due date deleted (09/08/2025)
Actions #24

Updated by ziniy Kang 6 months ago

  • % Done changed from 100 to 90
Actions #25

Updated by Dante Le 5 months ago

  • Due date set to 09/29/2025
  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Dante Le to Tracy Truong

Hi Tracy Truong, please test again according to the new request.

Actions #26

Updated by Tracy Truong 5 months ago

Verification Complete & Failed: Content in ENG ver is different, please check it
Figma: https://www.figma.com/design/0x5UMVnHNR7eo4sbHoy7Gn/Email-Template?node-id=695-2385&t=ma7ACwTWy5ZuZUth-1

Actions #27

Updated by Dante Le 5 months ago

  • Status changed from 완료실패(Failed) to 진행(Doing)
Actions #28

Updated by Dante Le 5 months ago

  • Status changed from 진행(Doing) to QA test
  • Assignee changed from Dante Le to Tracy Truong

please test again Tracy Truong

Actions #29

Updated by Tracy Truong 5 months ago

Rechecked, ok

Actions #30

Updated by ziniy Kang 5 months ago

  • Status changed from 완료(Done) to 확인(Confirmed)
Actions #31

Updated by ziniy Kang 5 months ago

  • % Done changed from 90 to 100
Actions #32

Updated by ziniy Kang 5 months ago

  • Status changed from 확인(Confirmed) to QA test
Actions #33

Updated by Tracy Truong 5 months ago

Actions #35

Updated by Dante Le 5 months ago

  • Assignee changed from Dante Le to John Lee
Actions #36

Updated by John Lee 5 months ago

  • Status changed from 완료실패(Failed) to 진행(Doing)
Actions #37

Updated by John Lee 5 months ago

  • Status changed from 진행(Doing) to QA test
  • Assignee changed from John Lee to Tracy Truong
Actions #38

Updated by Tracy Truong 5 months ago

  • Status changed from QA test to 완료실패(Failed)
  • Assignee changed from Tracy Truong to John Lee

Tracy Truong wrote in #note-33:

Please change font to Pretendard & text color is #000
Design: https://www.figma.com/design/rKpXzV8hRJIgtVK4QtJqi8/B2C--B2B?node-id=11536-1953&t=QDjvlw6EnJV78TX5-1

Still failed

Actions #39

Updated by John Lee 5 months ago

  • Status changed from 완료실패(Failed) to 진행(Doing)
Actions #40

Updated by John Lee 5 months ago

  • Status changed from 진행(Doing) to QA test
  • Assignee changed from John Lee to Tracy Truong
Actions #41

Updated by Tracy Truong 5 months ago

1. Please change font to Pretendard & text color is #000 => ok
2. Wrong content in KR ver => fixed, ok

Actions #42

Updated by Tracy Truong 5 months ago

  • Related to QA #1971: [STG] Email template/UI inconsistent between PC action and MO view added
Actions #43

Updated by ziniy Kang 4 months ago

  • Build env. changed from Staging to Prod
Actions #44

Updated by John Lee 4 months ago

  • Status changed from 완료(Done) to QA test
Actions #45

Updated by John Lee 4 months ago

  • Assignee changed from John Lee to Tracy Truong
Actions #46

Updated by Zia Han 4 months ago

  • Related to 개선(improvement) #2158: [Design] Adjust Text for Email Verification Page (Expired/Already Verified Case) added
Actions #47

Updated by Tracy Truong 4 months ago

For case verify failed, there is new update UI so will test later

Actions #48

Updated by Tracy Truong 4 months ago

  • Related to QA #2204: [PROD] Delete hyperlink of footer in all MO email template added
Actions #49

Updated by Tracy Truong 4 months ago

  • Related to QA #2034: Change all phone numbers as below in the footer section of the email template. added
Actions #50

Updated by Tracy Truong 4 months ago

  • Status changed from QA test to 완료성공(Resolve)
  • Assignee changed from Tracy Truong to John Lee
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)