Project

General

Profile

Actions

개선(improvement) #1089

closed

개선(improvement) #1200: * 오마이호텔 기능 오류 최종 점검 / Final check of OMH system errors

[Feedback - MO] Keep the category with the selected option open in ‘Searching in Results’.

Added by Lexi Kim 7 months ago. Updated 6 months ago.

Status:
완료성공(Resolve)
Priority:
보통(Normal)
Assignee:
Start date:
09/09/2025
Due date:
09/09/2025
% Done:

100%

Estimated time:
Part:
MO
Build env.:
Prod

Description

‘Searching in Result’에서, 선택된 옵션이 있는 카테고리를 펼침 상태로 유지한다.
Keep the category with the selected option open in ‘Searching in Results’.

Storyboard
https://www.figma.com/design/kg17cCYsyePPSt8uKAoddU/1070-QA-?node-id=1-159&t=IA7tZQu73H7qwnYP-1


Files

7023583290494.mp4 (2.97 MB) 7023583290494.mp4 Tracy Truong, 09/18/2025 02:31 AM
Actions #1

Updated by Lexi Kim 7 months ago

  • Assignee changed from Lexi Kim to Joseph Vo
Actions #2

Updated by ziniy Kang 7 months ago

Task này cần hoàn thành trước 29/8.

Actions #3

Updated by ziniy Kang 7 months ago

  • Priority changed from 보통(Normal) to 높음(High)
Actions #4

Updated by Joseph Vo 7 months ago

  • Subject changed from [MO] Keep the category with the selected option open in ‘Searching in Results’. to [Feedback - MO] Keep the category with the selected option open in ‘Searching in Results’.
  • Assignee changed from Joseph Vo to harry harry
  • Priority changed from 높음(High) to 보통(Normal)

harry harry this task should implement after finish login sigup process.

Actions #5

Updated by ziniy Kang 7 months ago

  • Parent task set to #1200
Actions #6

Updated by harry harry 7 months ago

  • Assignee changed from harry harry to Dante Le
Actions #7

Updated by Dante Le 6 months ago

  • Due date set to 09/09/2025
  • Status changed from 신규(New) to 진행(Doing)
  • Start date set to 09/09/2025
Actions #8

Updated by Dante Le 6 months ago

  • Status changed from 진행(Doing) to 완료(Done)
Actions #9

Updated by Dante Le 6 months ago

  • % Done changed from 0 to 100
  • Build env. set to Dev
Actions #10

Updated by Dante Le 6 months ago

  • Assignee changed from Dante Le to Tracy Tran
Actions #11

Updated by Dante Le 6 months ago

  • Build env. changed from Dev to Staging
Actions #12

Updated by Dante Le 6 months ago

  • Assignee changed from Tracy Tran to Tracy Truong
Actions #13

Updated by Dante Le 6 months ago

  • Status changed from 완료(Done) to QA test
Actions #14

Updated by Tracy Truong 6 months ago

  • Status changed from QA test to 완료(Done)
  • Assignee changed from Tracy Truong to Dante Le

Checked on STAG, ok

Actions #15

Updated by Dante Le 6 months ago

  • Status changed from 완료(Done) to QA test
Actions #16

Updated by Dante Le 6 months ago

  • Build env. changed from Staging to Prod
Actions #17

Updated by Dante Le 6 months ago

  • Assignee changed from Dante Le to Tracy Truong
Actions #18

Updated by Tracy Truong 6 months ago

Checked on Prod, ok

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 50 MB)